
Cook line, ready for service
Kitchen floor and coving finished under the fryers and cook line, handed over clean for opening.
Projects
Fast food kitchens and retail fit-outs, finished to spec. No stock photos.

Kitchen floor and coving finished under the fryers and cook line, handed over clean for opening.

Floor laid to falls with tiles split to every waste, and full-height wall tiling behind the line.

The real test: a busy kitchen, hot oil and constant traffic, every day.

Gloss wall tiling and a hard-wearing floor where customers and crew cross all day.

Floor tiles, coving and a raised equipment plinth, laid to falls and ready for the fit-out.

Metz floor and wall tiling finished and handed over ahead of the equipment install.

Metz 20B polyurethane joint at the cove junction, where a shortcut tiler would run grout.

Envelope cuts so every tile falls to the drain. No ponding, nothing for grease to sit in.

Cove tiles in line along the full run, with joints at the junction.

Black and white marble-look porcelain set out on the diagonal through a shopping centre café.

One continuous floor from the mall frontage through to the service counter.
Selected photography by Studio Blackardt.
Brands we've worked for